Factory wholesale Custom Aluminum Extrusion Profiles - CNC aluminum extrusion machining,America hard disk case | CHINA MARK – Weihua

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We consistently execute our spirit of ''Innovation bringing progress, Highly-quality ensuring subsistence, Administration advertising and marketing gain, Credit history attracting buyers for precision cnc machining china, cnc machining precision parts, spray painting, Your support is our eternal power! Warmly welcome customers at home and abroad to visit our company.
Factory wholesale Custom Aluminum Extrusion Profiles - CNC aluminum extrusion machining,America hard disk case | CHINA MARK – Weihua Detail:

CNC aluminum extrusion machining

 

Description We use high-precision aluminum extrusion extruder and high-purity 6063 aluminum rods, through customized processing of profile molds, producing various types of computer hinge and hard disk case
Processing Alum bar heating machine-Raw material extrusion-Aging-Precision cutting-Full inspection-Package-Delivery
Application America hard disk case
NW  85g
Mold  Alum extrusion mold
LT  10 days
Type  OEM Parts
Mass production Lead time 4weeks

 

20 years of experience in cold stamping/drawing/hot forging industry of aluminum alloy, focusing on die opening and punching/drawing/forging /CNC production and processing of aluminum products, aluminum extrusion mold.

Aluminum extrusion for China science and technology, widely used, complete categories, excellent quality, first-class service, impact extrusion aluminum can be customized according to different needs, welcome to consult;

 Aluminum extrusion fabrication extrusion process

 I. operating procedures:

1. Heat the ingot cylinder to 380℃– 420℃ in the form of heating gradient of 100℃/1 hour.

2. According to the operation plan sheet, select the appropriate amount of appropriate aluminum bar furnace heating to 480℃– 520℃, special industrial profiles according to the specified process temperature.

3. According to the operation plan, select the mold in accordance with the plan, heat it up to 460℃– 500℃, and keep it warm for 2– 4 hours.

4. Start the extruder cooling motor — oil motor.

5. According to the single order of the plan, select the special cushion for the mold to be installed in the mold base, and lock the mold base in the extrusion position.

6. Lock the holding drum and lift the heated aluminum bar to the aligned position of the material gallbladder by using the feeding rack.

7. Master cylinder forward extrusion

8. The initial pressing speed should be slow, and the medium speed should be adjusted according to the surface quality of the profile at the outlet.

9. Record the mold number, aluminum bar number, master cylinder pressure and discharging speed in detail in the original record.

 Ii. Process requirements

1. The temperature of aluminum rod heating on the machine is: A flat die: 500℃– 520℃ b. split die: 480℃– 500℃ c. special industrial materials are executed according to special process requirements.

2. Mold heating process: a. flat die: 460℃– 480℃ b. split die: 460℃– 500℃

3. Setting tube temperature: 380℃– 420℃ the end surface temperature of the ingot tube is 280℃– 360℃

4. The extruded material must have smooth surface, no hand feeling for longitudinal indentation, fine and even extruding grain, no bright belt, black line, plane gap between the Yin and Yang planes, Angle deviation, and the cutting Angle should be of high precision level according to the national standard.

5. Extrusion pressure: ≤200㎏/cm2

6 gall lock pressure 120㎏/cm2 — 150㎏/cm2.

7. Temperature of hydraulic oil ≤45℃

8. Profile outflow speed is generally controlled in: 5 m/min –30 m/min

10. Every extrusion of 80 rods -100 rods, must use special clean cylinder cushion to clean the bile.

 Three. Matters needing attention

1. During extrusion, if the die is plugged, the deadening time shall not exceed 5 seconds.

2. When installing the mold, pay attention to safety and prevent the screw from slipping off and breaking the foot.

3. When discharging, it is strictly prohibited to peep directly into the outlet.

4. Before mounting the die, the center position must be checked and the extrusion rod must be aligned. The no-load test machine should be run once before starting the machine.

5. Whether the temperature of the measuring rod, mold and ingot barrel meets the requirements.

6.3 — check the quality of 5 rods once.

Check oil temperature frequently.

8. Whether each aluminum bar is marked with furnace number and award number.

 

 

If you are interested in getting in touch with a our sales rep click here


Contact us

The main process shows as below

6063 round bar

Step 1:6063 round bar Ø100*350MM

Natural gas environmental protection aluminum rod heating furnace

Step 2:Natural gas environmental protection aluminum rod heating furnace

Electromagnetic mold heating furnace

Step 3:Electromagnetic mold heating furnace

1000 tons of high-precision profile extruder

Step 4:1000 tons of high-precision profile extruder

Natural gas environmental protection aluminum aging  furnace

Step 5:Natural gas environmental protection aluminum aging furnace

Double-rail type automatic sawing machine

Step 6:Double-rail type automatic sawing machine

“Our 40,000 square meters facility has the capabilities to meet all your extrusion aluminum, logo plates,precision stamping needs coupled with multiple fabrication options to produce high-quality products solutions. ”

― WEIHUA

Product detail pictures:

Factory wholesale Custom Aluminum Extrusion Profiles - CNC aluminum extrusion machining,America hard disk case | CHINA MARK – Weihua detail pictures


Related Product Guide:

"Quality very first, Honesty as base, Sincere assistance and mutual profit" is our idea, in an effort to create consistently and pursue the excellence for Factory wholesale Custom Aluminum Extrusion Profiles - CNC aluminum extrusion machining,America hard disk case | CHINA MARK – Weihua , The product will supply to all over the world, such as: Toronto, Austria, Cyprus, The best and original quality for spare parts is a most important factor for transportation. We may stick on supplying original and good quality parts even a little profit earned. God will bless us to do kindness business forever.
  • The sales manager has a good English level and skilled professional knowledge, we have a good communication. He is a warm and cheerful man, we have a pleasant cooperation and we became very good friends in private.
    5 Stars By Ray from Egypt - 2017.09.29 11:19
    This company has the idea of "better quality, lower processing costs, prices are more reasonable", so they have competitive product quality and price, that's the main reason we chose to cooperate.
    5 Stars By Belle from Zimbabwe - 2017.04.28 15:45
    Write your message here and send it to us